Specs in progress

  • East River Science Park High-Rise in Manhattan, NY
  • Harvard Allston Science Complex in Boston, MA
  • Hologic CYTYC Manufacturing Facility in Londonderry, NH
  • Massachusetts General Hospital Remodeling in Boston, MA
  • Kenyon College Student Residences in Gambier, OH
  • Drexel University Recreation Center in Philadelphia, PA
  • Miami Airport Expansion in Miami, FL
  • FM Global New Corporate Headquarters in Johnston, RI
  • Fort Lewis College Student Union in Durango, CO
  • Maritime Academy Library Expansion in Buzzards Bay, MA
  • Natick Mall Residences in Natick, MA
  • Penthouse Residence Remodeling on West 79th Street in NYC
  • Expansion of the Isabella Stuart Gardner Museum in Boston, MA
  • Wind Technology Testing Center in Boston, MA
Stripes

February 2010 News

Masdar selects Kalin Associates to prepare city master specifications
Masdar City in Abu Dhabi is the most ambitious sustainable development in the world today - planned to be the world’s first zero carbon, zero waste city powered entirely by renewable energy sources. Masdar has selected Kalin Associates to prepare master construction specifications for the city.
Mark Kalin heads Sustainable Facilities Practice Group for CSI
The Construction Specifications Institute has created a new Sustainable Facilities Practice Group in 2009 and plans presentations at this year’s CSI Convention in Indianapolis. Mark Kalin is a member of CSI’s national technical committee, and is the first Chair of the practice group.
BIM Spec Integration in Prototype Phase
Working with CSI and the US Army Corps of Engineers, Kalin Associates has prepared Specifiers Property Sets which are being included in a demonstration project to be shown at FedCon in Washington in December.